NEGAbriefLocal records made useful
IssueFranklin Countyunder consideration

Permit application proposes shutting down oxygen remediation system and ending its well monitoring

A permit modification application before Georgia EPD would stop the iSOC oxygen diffusion system used for groundwater remediation and eliminate the wells that track whether it is working.

By NEGA Brief NewsroomLast checked October 15, 2026
Latest

May 1, 2026: Statistical exceedance of the TCTL for formaldehyde identified at well MW-7

What happens next

No next step has been documented.

At a glance

What this means now

Where it stands

The same application notes a statistical exceedance of the TCTL for formaldehyde at well MW-7, based on a result of 2.1 mg/L from a sample collected March 23, 2021.

The story

A permit modification application submitted May 1, 2026 proposes a trial shutdown of the iSOC oxygen diffusion remediation system and would eliminate sampling designed to monitor the system's effectiveness after it is shut down.

Sources2a_UCC Woodbine RCRA Permit Mod Application_May 2026_Text_Tables_Figures_AppsA-J

The application also proposes discontinuing sampling at two Todd Creek Sentinel wells, MW-25 and MW-51.

Sources2a_UCC Woodbine RCRA Permit Mod Application_May 2026_Text_Tables_Figures_AppsA-J

It separately proposes discontinuing sampling at interior monitoring well MW-49.

Sources2a_UCC Woodbine RCRA Permit Mod Application_May 2026_Text_Tables_Figures_AppsA-J

The same application notes a statistical exceedance of the TCTL for formaldehyde at well MW-7, based on a result of 2.1 mg/L from a sample collected March 23, 2021.

Sources2a_UCC Woodbine RCRA Permit Mod Application_May 2026_Text_Tables_Figures_AppsA-J

What happened

How this issue got here

Open any step for its supporting record. A proposal remains labeled as proposed until later evidence establishes an outcome.

Appeared on agenda
proposed

Trial shutdown of the iSOC oxygen diffusion remediation system and elimination of its performance monitoring wells

Eliminate sampling designed to monitor the effectiveness of the iSOC oxygen curtain remediation system after the system is shut down.

Appeared on agenda
proposed

Discontinuation of sampling at Todd Creek Sentinel wells MW-25 and MW-51

discontinue sampling at two locations (MW-25 and MW-51)

Appeared on agenda
proposed

Discontinuation of sampling at interior monitoring well MW-49

discontinue sampling at one location (MW-49)

Discussed
discussed

Statistical exceedance of the TCTL for formaldehyde identified at well MW-7

A statistical exceedance of the TCTL was identified at MW-7 based on the result of 2.1 mg/L reported from the sample collected March 23, 2021.

Research the record

Search the underlying agendas, minutes, and documents.

Search supporting records