The same application notes a statistical exceedance of the TCTL for formaldehyde at well MW-7, based on a result of 2.1 mg/L from a sample collected March 23, 2021.
Permit application proposes shutting down oxygen remediation system and ending its well monitoring
A permit modification application before Georgia EPD would stop the iSOC oxygen diffusion system used for groundwater remediation and eliminate the wells that track whether it is working.
May 1, 2026: Statistical exceedance of the TCTL for formaldehyde identified at well MW-7
No next step has been documented.
At a glance
What this means now
The story
A permit modification application submitted May 1, 2026 proposes a trial shutdown of the iSOC oxygen diffusion remediation system and would eliminate sampling designed to monitor the system's effectiveness after it is shut down.
The application also proposes discontinuing sampling at two Todd Creek Sentinel wells, MW-25 and MW-51.
It separately proposes discontinuing sampling at interior monitoring well MW-49.
The same application notes a statistical exceedance of the TCTL for formaldehyde at well MW-7, based on a result of 2.1 mg/L from a sample collected March 23, 2021.
What happened
How this issue got here
Open any step for its supporting record. A proposal remains labeled as proposed until later evidence establishes an outcome.
Appeared on agendaproposedTrial shutdown of the iSOC oxygen diffusion remediation system and elimination of its performance monitoring wells
Eliminate sampling designed to monitor the effectiveness of the iSOC oxygen curtain remediation
system after the system is shut down.
+
Trial shutdown of the iSOC oxygen diffusion remediation system and elimination of its performance monitoring wells
Eliminate sampling designed to monitor the effectiveness of the iSOC oxygen curtain remediation system after the system is shut down.
Appeared on agendaproposedDiscontinuation of sampling at Todd Creek Sentinel wells MW-25 and MW-51
discontinue sampling at two locations (MW-25 and MW-51)
+
Discontinuation of sampling at Todd Creek Sentinel wells MW-25 and MW-51
discontinue sampling at two locations (MW-25 and MW-51)
Appeared on agendaproposedDiscontinuation of sampling at interior monitoring well MW-49
discontinue sampling at one location (MW-49)
+
Discontinuation of sampling at interior monitoring well MW-49
discontinue sampling at one location (MW-49)
DiscusseddiscussedStatistical exceedance of the TCTL for formaldehyde identified at well MW-7
A statistical exceedance of the TCTL was identified at MW-7 based on the result of 2.1 mg/L
reported from the sample collected March 23, 2021.
+
Statistical exceedance of the TCTL for formaldehyde identified at well MW-7
A statistical exceedance of the TCTL was identified at MW-7 based on the result of 2.1 mg/L reported from the sample collected March 23, 2021.
Research the record