Those same planning documents lay out a proposed construction timeline, with a groundbreaking ceremony proposed for February to March, at the Commissioner's convenience.
Habersham County awards new animal control facility construction to a Construction Manager at Risk
The county's SPLOST VII-funded facility for stray and surrendered animals is moving into construction after the project was bid out and awarded.
July 22, 2024: New Animal Control Facility construction (SPLOST VII)
No next step has been documented.
At a glance
What this means now
The story
Habersham County's new Animal Control facility, a 15,000-square-foot building funded through SPLOST VII, has been bid out and awarded to a Construction Manager at Risk, according to the county's budget report.
Project planning documents show a proposed site and building redesign, including removing the livestock building, cutting back the dog park, and changes to the loading dock and driveways, along with a 250 ekW generator for the facility.
Those same planning documents lay out a proposed construction timeline, with a groundbreaking ceremony proposed for February to March, at the Commissioner's convenience.
What happened
How this issue got here
Open any step for its supporting record. A proposal remains labeled as proposed until later evidence establishes an outcome.
Appeared on agendaproposedAnimal Control facility construction timeline and groundbreaking ceremony
Groundbreaking Ceremony in February to
March, at Commissioner’s convenience.
+
Animal Control facility construction timeline and groundbreaking ceremony
Groundbreaking Ceremony in February to March, at Commissioner’s convenience.
Appeared on agendaproposedAnimal Control facility site and building redesign (removal of livestock building, incinerator, dog park reduction, loading dock, driveways)
Remove the Livestock Building
+
Animal Control facility site and building redesign (removal of livestock building, incinerator, dog park reduction, loading dock, driveways)
Remove the Livestock Building
ApprovedunknownNew Animal Control Facility construction (SPLOST VII)
construction has been bid out and awarded to a Construction Manager at Risk.
+
New Animal Control Facility construction (SPLOST VII)
construction has been bid out and awarded to a Construction Manager at Risk.
Research the record