NEGAbriefLocal records made useful
IssueFranklin Countyunder consideration

Georgia EPD draft permit would limit fuel sulfur, opacity and run hours for backup generators and fire pump

The draft notice proposes new restrictions on how much a facility's emergency generators and fire water pump can pollute and how often they can run.

By NEGA Brief NewsroomLast checked September 30, 2026
Latest

September 30, 2026: Annual hours-of-operation limit for emergency generators and fire water pump

What happens next

No next step has been documented.

At a glance

What this means now

Where it stands

The draft would also cap how long the equipment can run: the two generators and the fire water pump would each be limited to under 500 hours of operation in any twelve consecutive months, per the notice's proposed conditions.

The story

The Georgia Environmental Protection Division has issued a draft permit notice proposing several new conditions on emergency generators and an emergency fire water pump at a facility.

SourcesTV-938555 draft

One proposed condition would bar use of fuel that contains sulfur "in excess of 0.05 weight percent" in the equipment.

SourcesTV-938555 draft

Another proposed condition would limit exhaust opacity from the diesel generators and fire water pump, prohibiting operation when opacity is "equal to or greater than forty (40) percent."

SourcesTV-938555 draft

The draft would also cap how long the equipment can run: the two generators and the fire water pump would each be limited to under 500 hours of operation in any twelve consecutive months, per the notice's proposed conditions.

SourcesTV-938555 draft

What happened

How this issue got here

Open any step for its supporting record. A proposal remains labeled as proposed until later evidence establishes an outcome.

Appeared on agenda
proposed

Fuel sulfur content limit for emergency generators and fire water pump

fuel that contains sulfur in excess of 0.05 weight percent

Appeared on agenda
proposed

Opacity limit for diesel generators and fire water pump under Equipment SIP Rule

the opacity of which is equal to or greater than forty (40) percent

Appeared on agenda
proposed

Annual operating-hour caps on emergency generators, firewater pump, and auxiliary boilers

Any twelve consecutive month total hours of operation of the generators (emission unit ID Nos. GEN1 and GEN2) and the emergency firewater pump (emission unit ID Nos. FP1), each, which exceeds 500 hours.

Appeared on agenda
proposed

Annual hours-of-operation limit for emergency generators and fire water pump

equal or exc eed 500 hours per unit during any twelve consecutive months

Research the record

Search the underlying agendas, minutes, and documents.

Search supporting records